![]() Let us discuss how the load of the module is transferred to the crane. The most basic requirement is the lifting crane supposed to be of a capacity higher than 1000 tonnes (As per norms, crane safe working load to be at least 1.25 times the weight of the equipment). Let’s consider the weight of the module is about 1000 Tonnes. Let’s assume the weight of the module is about 1000 Tonnes. ![]() We will address these challenges and will explain in detail, how to tackle these problems.įor example, a process module to be installed on FPSO.